Solenoid valve installation and commissioning

Use and maintenance:
1. It is recommended to use the unit to assign someone to be responsible for, use and maintain.
2, 1-2 times a year of regular maintenance is a good way to work reliably and longevity of the solenoid valve. The following four conditions inside the solenoid valve are the reasons that hinder the normal operation of the solenoid valve and shorten the life.
(1), the medium changes during use (2), the rust in the nozzle (3), the oil oxidation of the air compressor, the carbon tar and other impurities, and the impurities in the pipeline 2.4 are mixed with dust and dirt.
3. After the solenoid valve is installed or is put into operation after being deactivated for a long time, it must pass through the medium and test the operation several times.
4. When the steam valve is put into operation again after being deactivated for a long time, the condensate should be drained and tested several times. After normal operation, it can be put into operation.
5. Before maintenance, the power must be cut off and the medium pressure removed.
6, the coil assembly should not be opened
7. When disassembling the solenoid valve for cleaning, you can use kerosene `trichloroethylene and other solutions. However, it should be noted that the rubber parts may melt up, so replace it.
8. When disassembling and cleaning, all parts should be restored in the original order.
9. Our company has wearing parts. Please indicate according to the instructions when ordering.
10. Disassembly order, wearing parts and other matters are not known, please consult the technical department of the headquarters ()

Installation instructions:
1. Read the product's instruction manual carefully before installation, check whether the product fully meets the requirements for use, familiar with the installation points, and prepare for the work.
2. When installing, the solenoid valve coil is up and kept in a vertical position. The arrow or mark on the solenoid valve should be consistent with the flow direction of the pipe, and should not be installed in places with splashing water or water leakage.
3. Before the takeover, the pipe is fully flushed with a pressure of 0.3MPa, the metal powder sealing material in the pipe remains, and the rust scale is completely removed. The working medium of the solenoid valve should be clean and free of particulate impurities. It is recommended to install the filter before the valve and install the steam pipe. Trap; dirt and filters on the surface of the solenoid valve internals must be cleaned regularly.
4. In the event of a malfunction of the solenoid valve, in order to isolate the solenoid valve in time and ensure the normal operation of the system, the bypass device is installed.
5. Do not install the valve in the low recess of the pipe to prevent steam condensation, impurities and the like from depositing in the valve and hindering the action.
6. Ordinary solenoid valves should not be used in flammable and explosive atmospheres.
7. In the case of insufficient rigidity of the pipe, it is recommended to fix the front and rear pipes of the valve with brackets to prevent vibration when the solenoid valve is working.
8. A pressure gauge is required on the pipe before and after the solenoid valve to observe the pipe pressure.


Urine drainage bags collect urine. Your bag will attach to a Catheter (tube) that is inside your bladder. You may have a catheter and Urine Drainage Bag because you have urinary incontinence (leakage), urinary retention (not being able to urinate), surgery that made a catheter necessary, or another health problem.

Plastic Bag

Urine Drainage Bag,Plastic Disposable Urine Bag, Drainage Urine Bags, Medical Plastic Bag, urine bag, drainage bag, drain bag, foley bag

Huali Technology Co., Ltd , https://www.jlhualitech.com